HANOI: CONSTRUCTING A ROAD ROUTE WITH LENGTH OF 10.000M OVER DAN PHUONG DISTRICT

Hanoi People’s Committee has enacted Decision on approving records of red boundary line for road route in the West Thang Long axis, section in Dan Phuong District, scale 1/500..
 
 
Hanoi: Built nearly 10,000 route through Dan Phuong district

The length of road route is 9.970m, running over communes Tan Lap; Tan Hoi; Dan Phuong; Thuong Mo; Phuong Dinh, Dan Phuong District, Hanoi.

The head point of this boundary line is located in the administrative boundary between Phuc Tho District and Dan Phuong District (linking to the road route of development axis of Phuc Tho District). The ending point is located in the administrative boundary between Dang Phuong District and Tu Liem District (linking to the route from Nam Thang Long Industrial Park to belt road IV- section in Tu Liem District).
The width of cross-section of the section from the administrative boundary of Phuc Tho District and Dan Phuong District to Belt road IV is 40m, including 2-lane road with width of 10,5x2; the middle median trip and sidewalk are consistent with structures of cross-section of the development axis of Phuc Tho District.
The width of cross-section of the section from Belt Road IV to administrative boundary of Dan Phuong District and Tu Liem District is 60,5m, including 2-lane road with width of 11,25mx2; width of 2-lane frontage road is 7mx2; width of middle median trip is 6m; width of median trip between main roadway and frontage road is 2m; width of sidewalk is 8m.

[Back]



Related news

The Company will submit 5 planning plans in May 2012, Hanoi